Construction and installation
1. Treat the base: Before construction, clean up the impurities on the surface of the base of the wall to ensure that the wall is basically flat.
2. Cut according to the design drawings, color the edges, and then use structural glue for paving.
3. Mushroom stone pasting: it should be pasted from bottom to top, and the bonding thickness should be between 4 and 8mm.
4. Clean the surface: When the structural adhesive is fast drying, blow off the dust on the surface and stick a protective film on it.
Product Application
Apartment,Shopping Mall,Hotel,Restaurant,School,office Building,etc
Hot Color
Related hot sales products, contact us to know more information
More products for your choose,please contact us.
Our Services